CBFI® 5 Tons Ice Block Machine for Gangmula Mountain Tunnel - CBFI

About CBFI

Tel: 0086 133 9268 4607

E-mail:sale@icemakerchina.com

Projects
you are here:Home > Projects > Case-Block Ice Machine > CBFI® 5 Tons Ice Block Machine for Gangmula Mountain Tunnel

CBFI® 5 Tons Ice Block Machine for Gangmula Mountain Tunnel

The Concrete Cooling Projects Backgroup

       The Gangmula Mountain Tunnel is located in the Tibet Autonomous Region. It is one of the control projects of the entire Lalin Railway.

The tunnel is located in the seismic zone and is a national high-risk tunnel. Geothermal, rock burst, and faults are the main problems 

of the tunnel construction. The total length of the tunnel is 11660 meters, of which the single-line tunnel is 11357 meters long, the station

 tunnel is 303 meters long, and the maximum buried depth is 1800 meters.

The Project Demand

5 tons Ice Block Machine for Tunnel Cooling